REFINERY / OIL & GAS INDUSTRIES / RENEWABLE ENERGY

Infrastructure for solar energy farm

Infrastructure for solar energy farm Infrastructure for solar energy farm Infrastructure for solar energy farm

Description :

Design, survey and construction of 130 metres earth-fill compaction road and 7 centimetres thick concrete lining d 260 metres approximately long, along the project boundary,including 400 metres U-ditch dredging.

Project Name :

Infrastructure for solar energy farm

Client :

BCPG Public Company Limited

Location :

Amphoe Bamnet Narong, Chaiyaphum